The total cost of the project was estimated during the appraisal mission undertaken by the Bank’s delegation to the site from 23rd to 29th April 2021, at US$ 48 million, of which a substantial part will be financed by BADEA (US$ 43 million) and the Government of Guinea Bissau (US$ 5.6 million).
“C’est un prêt concessionnel, le taux d’intérêt varie entre 1,5 et 2%
the project is divided into 2 sections
The project is scheduled to start in May 2022 and end in 2024.
From 23rd to 29th April 2021, a BADEA mission visited Guinea Bissau. It was composed of :
The day after its arrival, the mission had working meetings with the officials of the Ministry of Public Works, Construction and Urbanism. At the end of these meetings, a work programme was established by mutual agreement
During its stay, the mission was received in audience by H.E. the Minister of Finance, H.E. the Minister of Public Works, Construction and Urbanism, H.E. the Minister of Economy, Planning and Regional Integration and H.E. the Minister of Transport and Communication respectively. During the meetings, the Ministers expressed their satisfaction with the bilateral cooperation between Guinea Bissau and BADEA and commended BADEA’s support to the development process of Guinea Bissau and the efforts made to finance priority road projects Translated with www.DeepL.com/Translator (free version)
The Minister of Public Works, Construction and Urbanism also reassured BADEA’s Mission that the Government will take the necessary measures to ensure the smooth running of the project.
This aide-memoire relates the main conclusions agreed with the Government at the end of the evaluation mission of the priority road projects, which consist of the construction of the 12.9 km South Bissau bypass and the construction of the Bissau-Nhacra road and the bypass to Cuméré (14.1 km)
L’objectif global du projet est de contribuer à l’amélioration du cadre de vie et des conditions de mobilité dans la ville de Bissau et sa périphérie, ainsi que l’amélioration des conditions de développement économique et sécuritaire dans la zone du projet.